Kohesio: discover EU projects in your region

project info
Start date: 9 June 2017
End date: 31 December 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 193 324 110,00 €
EU contribution: 110 640 000,00 € (57,23%)
programme
Programming period: 2014-2021
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego
intervention field
beneficiary

Extension of the functionality of the LNG Terminal in Świnoujście

It’s the ass. 1. ‘Increasing the regasification power of the Terminal by expanding the SCV regasifier system’ – within the existing LNG Terminal in Świnoujście. Nominal shipping capacity will be increased to 7.5 billion m³/year (855 000 Nm3/h), while peak regasification capacity will be: 8.62 billion m³/year. It’s the ass. 2. “Expansion of the LNG Terminal Maritime Transhipment System” – within the existing LNG Terminal in Świnoujście. Zad.3. ‘Expansion of the land loading system of the LNG Terminal’ – a loading system within the existing LNG Terminal in Świnoujście, part of the railway infrastructure located outside the Terminal, in its close vicinity. It’s the ass. 4. “Construction of the 3rd LNG tank with the required installations and equipment” – within the existing LNG Terminal in Świnoujście.

Flag of Poland  Szczeciński, Poland