The subject of the project is the construction of the Hermanowice-Strachocina gas pipeline. The project is located in the communes of Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne belonging to Podkarpackie Voivodeship. The project envisages the implementation of the following projects: construction of the Hermanowice – Strachocina pipeline with the following parameters: nominal diameter: 700 mm, working pressure: 8,4 MPa, pipeline length: L= 71,7 km as well as: five draw-off systems, connection system to Hermanowice node, regulation/reduction and measurement system in the area of Hermanowice node, transmission and reception locks in the Hermanowice node, systems, cathode protection system, cathode protection station and power supply systems (AKPiA) with connections.