The subject of the project is the construction of the Zdzieszowice-Wrocław gas pipeline. The project is located entirely in the Opole and Lower Silesian Voivodeships. Pipeline run on the territory of individual communes: Leśnica, Zdzieszowice, Gogolin, Tarnów Opolski, Prószków, Opole and Opole, Komprachcice, Dąbrowa, Lewin Brzeski, Olszanka, Skarbimierz, Oława and Oława, Czernica, Długołęka presents the map attached to the application. The project envisages the implementation of the following projects: construction of the Zdzieszowice-Wrocław pipeline with the following parameters: nominal diameter: 1000 mm, working pressure: 8,4 MPa, pipeline length: it’s okay. 130 km The investment consists of the construction of a pipeline with a length of about 130 km, a DN1000 diameter and a maximum working pressure (MOP) of 8.4 MPa, three branches: — DN400 in the district of Opolskie, in Tarnów Opolskie, in the area of: Angles of Opole, Nawory, with a length of approx. 4.0 km, – DN300 in the Brest district, in the building of Lewin Brzeski, Buszyce region, approx. 0.3 km, – DN200 in Oław district, in Oława commune, Godzikowice region, approx. 0,3 km and associated infrastructure: — nine dam-off units, – connection system with the designed DN1000, MOP 8.4 MPa relations between Czeszów Kiełczów, – the connection system with the designed Zdzieszowice gas pipeline – Kędzierzyn Koźle DN1000 MOP 8.4 MPa, – an electrical lock and a receptive piston in the protection of the dam-off system in Skarbimierz and the casing lock system – the casing system at the system.