The project included the modernisation of the 220 kV and 110 kV switchgears (in the field of 220/110 kV autotransformers) of the Żukowice power station. As part of the construction works, the Contractor is obliged to perform, among others: 1. Executing earthworks – land replacement, compaction, levelling, 2. Construction of a technological building with internal installations (heating, primary and emergency lighting, sewerage, ventilation, sockets, water installations) – condition enabling the introduction of secondary circuits and other SEs, 3. Dismantling of switchgears (including high constructions, disconnectors, current converters, ETN chokes, apparatus support structures) and disassembly of the AT1 and AT2 together with their disassembly, 4. Reconstruction and modernisation of fields 1-5 (ready to supply voltage), 5. Fire installation, 6. Construction of cubature buildings with internal and access roads, fence, dehydration, lighting, sewage and water systems, cable sewerage, 7. Own needs of stations – supply and assembly of equipment and apparatus (SN, nn, 220DC, 230AC, battery and rectifiers, generator generator), 8. General systems, including transformer monitoring, SOT, ARST, interference recording, ZSZ, LRW circuit circuits, cable connections. Telecommunications with 48 V power supply – installation of devices and wiring in the SE range, 9. SSiN – mounting equipment, 10. Execution of works in the field of expansion and modernisation of the station infrastructure to the applicable standards of PSE S.A., 11. Work on stationary systems, secondary and auxiliary circuits, 12. Telecommunications and Communications Works, 13. Execution of necessary works in related objects, 14. Micronisation, finishing work.