The project assumes the construction of a power station – a grid switchgear (RS) Garaszewo in a two-system system with a longitudinal and transverse clutch together with the output. The project also includes the construction of a 2-track and 1-track 110 kV line from SE Kromolica to GPZ Nagradowice with cross-sections of 240 mm² each to create three linear relations: 1. SE Kromolice – GPZ Gądki, 2nd and 3rd. SE Kromolice – GPZ Nagradowice and SE Kromolice – GPZ Swarzędz (in double track layout). The direct objective of the project is to increase the energy security of the Poznań agglomeration.