The subject of the project is the construction of the Czeszów-Kiełczów gas pipeline. The project is located entirely in the Dolnośląskie Voivodeship (weakly developed). The project envisages the implementation of the following projects: construction of the new Czeszów-Kiełczów gas pipeline (on the section of Czeszów – Kiełczów junction) together with the infrastructure (2 firewalls, connection unit, cathode protection and communication and control equipment) with the following parameters: — nominal diameter: 1000 mm – maximum working pressure: 8,4 MPa – pipeline length: it’s okay. 33.0 km