The subject of the project is the construction of the Tworóg – Curtain with DN1000 diameter and maximum operating pressure of the ILO 8.4 MPa, the Tworóg gas transfer node with the universal lock of the inspection piston, along with the accompanying infrastructure, linear firewalls with bypass systems equipped with collectors to connect new stations/receivers (ZZU, Blachownia).