The project consists of 9 tasks and will be carried out in the area of Świętokrzyskie voivodship, Sandomierz district – Sandomierz city and commune: Samborec, Images, Wilczyce, Obpatowski district – communes: Ożarów, Wojciechowice pow. Ostrowiecki – towns and communes of Ćmielów and communes: Bodzechów and the town of Ostrowiec Świętokrzyski. There is a gas infrastructure on the above-mentioned area. The gas network is operated by PSG sp. z o.o., Branch in Tarnów, Zakład w Sandomierz and Zakład w Kielce. The gas supply takes place through the existing gas pipeline in/c DN 300 of the Sandomierz – Ostrowiec Świętokrzyski relations. The DN 300 connector for connection with the existing gas pipeline DN 350 Zarzekowice – Ostrowiec – Romanów, which is also a source of gas for Lubień node, is removed from the DN 300 pipeline. Gas pipelines in/c DN 300 and DN 350 operate at the bandwidth limit and maximum operating pressure, frequent leakages and failures. The project is trans-regional and strategic in order to ensure continuity of supply in Świętokrzyskie voivodships and energy security of neighbouring voivodships (especially towards Mazowieckie voivodships). After completion, the gas pipeline w/c DN 500 will be the main source of power in the communes and districts of the above mentioned districts and will replace the existing, inefficient DN 300 gas pipeline. The project will be implemented in less developed areas. The direct objective is to: ensuring the security of the gas supply of customers from the Districts of the Gas Distribution in Sandomierz and Starachowice and allowing to cover the growing demand for gas in the Świętokrzyskie Voivodeship and in neighbouring voivodships. Length of the gas network built (total): approx. 57 km