The subject of the project is the construction of the Strachocina – Pogórska Wola gas pipeline. Project GAZ-SYSTEM S.A. The project is located in the Małopolska and Podkarpackie voivodships. The scope of works includes the construction of the new DN1000 ILO 8.4MPa gas pipeline with a length of approx. 97 km with infrastructure: —6 firewalls DN 1000 on the pipeline route, -1 dam-and-up unit DN 1000 in the area of the node in Pogórska Wola, in the place of connection with the gas pipeline DN1000 Pogórska Wola – Tworzeń, -connection system with the installation of gas pressing plant in Pogórska Wola, – a universal service for cleaning and diagnostics of the gas pipeline in the area of the Volunteer Campaign, the Elephant Sealing System, the