The object of the project is the construction of the DN1000 ILO 8.4MPa gas pipeline with a length of 168 km together with the infrastructure necessary for its operation, among others: underground firewall units, access roads and power supply for firewalls, fibre optic and automatic cathode protection stations of the gas pipeline with the possibility of monitoring. The implementation of the task shall also include: • the construction of the transmitting lock, together with the switching team (in the area of the existing Gazu Pogórska Wola), which will constitute connections with the technological systems of the Pioneer Pogórska Wola and the Strachocina-Pogórska Wola gas pipeline, • construction of the existing gas station Lisia Góra into the designed gas pipeline DN1000 can be built with the inlet pipeline DN100, MOP 8.4MPa, • construction of the dispensable node.