The subject of the project is the construction of the DN1000 ILO 8.4MPa gas pipeline with a length of 55 km from the Tworóg node (implemented within the framework of the Kędzierzyn – Tworóg project: śląskie voivodship, Tarnogórski county) to the dam-off team of Tworzeń (Silesian Voivodeship, City of Dąbrowa Górnicza) together with infrastructure: 5 firewall systems along the pipeline route, cathode protection devices, communication and control system – fiber optic line, power connections.