The implementation of the project results from the identified needs and shortages of the system related to the power supply of the city of Poznań. The project consists of the reconstruction/modernisation of the power station WN/SN kV – GPZ Górczyn and includes its scope, among others. : • on the site of the existing construction of an overhead, two-section, single-system switching station; • station building; • SN switchgears; • construction of two stations for 110/15 kV transformers; • own needs positions with adjustable compensation current; • parallel capacitor batteries stations; • installation of new batteries; • construction of two 110/15 kV transformers; • installation of an additional 15/6 kV transformer • security and telemechanics; • communication; • restoration of links on the side of 110 kV (overhead) Plewiska and Poznań Południe and connections of 15 kV; • construction of additional power via decoupling from the 110 kV line of Krauthofer-Junikowo relationship.