Start date: 24 March 2016
End date: 28 September 2018
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 17 088 231,64 €
EU contribution: 14 524 996,90 € (85%)
programme
Programming period: 2014-2021
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego / Departament Programów Ponadregionalnych
beneficiary

Extension of the public transport network for the Integrated Communication Centre for LOF

The subject of the project is: 1. Construction of ul. Musical along with buspas and trolleybus traction: — construction of ul. The music section from the height of the exit to the city stadium to the intersection with the street. Deep, hive. Nadbystrzycka and St. Narutowicza, including the construction of: roadways with double-sided buses, sidewalks, bicycle paths, trolleybus traction, service roads, lighting, light signalling, which will be incorporated into the existing traffic management system, bus bays, technological channel, bridge facility along the street. Musical on the Bystrzyca river, tree cutting and planting of greenery, construction and reconstruction of underground armament network, construction and expansion of rainwater drainage, land development along the road. 2. Construction of missing sections of trolleybus traction in ul. John Paul II from St. Granite to al. Kraśnicka, al. Kraśnicka from ul. John Paul II to the existing trolleybus loop and substation with the adaptation of power management. 3. Purchase of rolling stock for trolleybus traction – trolleybuses with additional drive. 4. Bus stop information system within ul. John Paul II, including the construction of 4 power supply connections, dynamic passenger information boards with support structure and integration into the current system. The main users of the project will be: residents of Lublin, LOF, Lublin Voivodeship, students and tourists.

Flag of Poland  Lubelski, Poland