Start date: 1 August 2017
End date: 31 August 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 34 117 899,88 €
EU contribution: 28 986 937,16 € (84,96%)
programme
Programming period: 2014-2021
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego / Departament Programów Ponadregionalnych
beneficiary

Construction and reconstruction of DW 835 in Lublin on sections: from the border of the city to the intersection of ul. Abramowicka from St. Orchard, since the intersection of ul. Kunicki from St. Squadron 303 to St. Wrotkowska along with the construction of the intersection with DW 830.

The subject of the project is the construction and reconstruction of the communication corridor along the Voivodeship Road No. 835 in Lublin (DW835 – letter of the Lublin Voivodeship Board dated 11.12.2014, sign: DT-IV.8012.7.2014.JMG) on 3 sections requiring intervention, i.e.: 1) construction of a new road connecting Kunickiego Street with Wrotkowska Street, including the construction and reconstruction of: — extensions of ul. Squadron 303, approx. 1,76 km (construction: 1,05 km, reconstruction: 0,71 km; —the flyover by long. 300 m above the railway siding track; —inclusion of existing streets into the newly built section of dr. voivodship, construction of 3 intersections, adaptation of the existing road system; —expensive service., -chanaliz.deszcz., -channel technologist., Zad.2) extension of Abramowicka Street on the section from Sadowa Street (from the crossroads) to the border of the city with a length of 2.5 km with construction, among others: dehydration, channel technologist, refurbishment of intersections. Zad.3) reconstruction of the road system along with the construction of the intersection of streets:Diamentowa, planned precinct Lublinskie Lipca‘80 – LL’80(DW835) and Krochmalna (DW830), including the construction of: —two-level crossings with the island of central. at the intersection of the above mentioned street, -viaduct in the course of streets:Krochmalna-Diamentowa, -reconstruction of inlets of streets:Krochmalna, LL'80,Diamentowa in order to adapt to the new road system., -connectors for the needs of trolley transport., -chanaliz.raszcz., As part of each of the tasks will be carried out: bicycle paths, sidewalks, bus bays, lighting, traffic-free equipment and reconstruction of interfering infrastr.tech. Products of the project: —construction. road of voivodship 835: 1,18 km; —reconstruction. road of voivodship 835: It’s 3,95 miles. Main users of the project: — residents of Lublin and LOF, residents of the voivodships orels. and neighboring voivodships, – drivers of passenger cars. in transit, -professional drivers.

Flag of Poland  Lubelski, Poland