project info
Start date: 6 February 2015
End date: 28 February 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 29 473 619,18 €
EU contribution: 25 052 576,30 € (85%)
programme
Programming period: 2014-2021
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego / Departament Programów Ponadregionalnych

Reconstruction of DW 678 on the Kleosin – Markowszczyzna section

The investment is a continuation of the implementation of the Project Reconstruction.DW678 Białystok-Kleosin, which is part of the comprehensive development of road infrastructure. BOF will continue the stages of the Podl. Voivodeship Projects and the City of B-stok, i.e.: —Reconstruction of DW682 Markowszczyzna Łapa; Work DW682/681 Claws Plants Sealings; It’s a remodel. DW678 from Ciołkowskiego Street from Mickiewicza to Ciołkowskiego Street from Sulika (DK65) and Construction of the so-called. Independence route (urban circuit incorporation into DK65); Bud, it’s Bud. DW669 in B-stok from the crossroads al. John Paul II from the National Armed Forces (DW676/669) to ul. Ciołkowski (DW678) and finally the Node Growing – Incorporation into the S8. The project will be a stage of development of the infrastructure of the BOF area completing the construction of bypasses/rings connecting DK19 via ul. Ciołkowski connecting with Kleosin and leading significant traffic from Białystok towards Łap and Wys.Maz. further to DK65 via Niepodl Route. (prolongation of Ciolkowski’s street to implementation from PORPW of projects that constitute the B-stok bypass to S8) will be carried out, among others: roadworks: crossroads with lower category roads, pavements, pavements, cycle path. cycle tracks on foot. bus bays green acoustic screens engineering objects i.e. bridges, culverts, pedestrian underground passages; tech infrastructure.: sewer. rain. street traffic lights, tech channel. Products of the Project: construction of new roads long. 3.7 km and reconstruction of 2.95 km voivodship roads, time savings in transports after 2019-36.9 % of costs and load capacity will increase to 115 kN/axis. The public nature of the road guarantees equal and unlimited access for all users, including: residents of B-stok and surrounding areas commuting to work or using health care or offices in B-stok so-called: local (economic) road users including those using transit potential and current investors and their counterparties using the infrastructure of rescue services and others.

Flag of Poland  Białostocki, Poland