The investment consists of the reconstruction of DW 762, which starts in the footsteps directly behind the three-intake junction with the street. Kielce in Chęciny in km 0 + 000 (working kilometer – working kilometre km 0 + 000 corresponds to the existing kilometre of km 15 + 213) and ends at the border with the municipality of Małogoszcz in km 10+ 168. Route DW 762 within the boundaries of the city of Chęciny bypasses the close buildings of the centre and runs on its north side. The project’s material scope includes: —development of DW 762 to the parameters of the technical class G – construction of access roads to the real estate, walking-bike and lighting -construction and construction of individual and public exits – refurbishment of existing ordinary intersections – reconstruction and construction of bus bays with existing platforms and places for worlds – demolition of existing intersections and construction of a new bridge on the river Hutka – construction of drainage of the road, construction of existing bridges and construction of a new bridge on the Hutka river – construction of drainage and drainage power grids, telecommunications networks and sanitary networks – construction of road safety devices and execution of horizontal and vertical marking – construction of the control and weighing of vehicles, meteo stations, planting of vegetation Project indicators -Length of reconstructed voivodship roads – 10.16 km -Length of built roads for bicycles – 10.16 km The users of the project will be participants of the road traffic on this section, i.e. drivers, passengers, cyclists and pedestrians. The reconstruction of the road will affect the economic development and attractiveness of the region and surrounding areas. As a result of the project, the road capacity will be increased. This will save travel time and improve travel comfort. In addition, the implementation will improve the safety of road users and residents of nearby towns.