Kohesio: discover EU projects in your region

project info
Start date: 1 June 2018
End date: 31 December 2018
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 242 254,79 €
EU contribution: 146 159,31 € (60,33%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski, Departament Rozwoju Regionalnego
intervention field
beneficiary
European Commission Topic

Reconstruction of the pavement along Przemysłowa Street into a pedestrian-bike line, stage II in Janikowo

The aim of the project is to build a pedestrian-bike line in Janikowo in ul. Industrial along the district road no.2548C of Rybitwa – Janikowo from ul. Main to the border of the municipality towards Pakość. The task for the construction of a foot-bike line was divided into two stages. Stage I includes a section from ul. Railway station km 0 + 000 to ul. Main km 0+ 824 long. 824 m and is not the subject of this proposal. This project concerns stage II, which covers the section from ul. Main km 0+ 824 to the border of the municipality km 3 + 230.50 long. 2406.50 m. The designed track in Janików will be connected with the existing bicycle path running from Słoneczna Street. Since the track ends at the border of the commune of Janikowo and Pakość, it will be possible to connect it with the lines that will be located in the neighbouring commune Pakość. There will also be a further possibility of continuing the cycling route towards Strzelno in connection with the modernisation of the DK 255 – Strzelno provincial road, where the construction of a bicycle path was planned. The construction will consist of the construction of a new pavement of asphalt concrete on the existing pavement and extending the surface to 2.5 m. The entire task will be carried out in the existing demarcation of the road lane.

Flag of Poland  Inowrocławski, Poland