The investment is a continuation of the project "Building Ogińskiego Street in Bydgoszcz on the section from ul. Wielkopolskie insurgents to ul. The Polish Army, along with engineering facilities and commutings. Construction of the second stage ul. Ogiński is a section of one larger transport corridor. The main objective of the project is to improve the conditions for communication of further settlements located in the southern part of Bydgoszcz with the city centre and northern districts and with the network of national roads (through a road junction in the intersection of ul. Ogińskiego from ul. John Paul II). In addition, the project will improve traffic conditions on the current road network in this area, optimise the distance and time of access to southern settlements, improve the technical condition of roads within the investment and optimise the route of transport lines. The task will improve the safety of traffic and the comfort of driving on reconstructed roads due to the equality of the pavement, the lack of gaps and wider lanes, and safety of traffic and comfort of pedestrians and cyclists resulting from the construction of pedestrians and bicycle paths. The scope of activities to be implemented within the project concerns the execution of project documentation, the updating of the feasibility study, construction works under the basic contract and additional works (if necessary), installation of the ITS System, carrying out information and promotion activities, acquisition of real estate, and carrying out supervision. The scope of the project includes the construction of the provincial road ul. Oginski’s long. 0.430 km along with the construction of a road junction at the intersection with DK5, reconstruction of sections of streets, which constitute the necessary accompanying infrastructure, the construction of engineering facilities (viaduct), resistance walls, small roundabouts, pavements, bicycle paths, extension of the ITS system.