The operation involves the creation of a water purification unit, powered by the SAPHIR reservoir in Gol les Hauts (20 000 m3), and the installation of a treated water storage tank with a capacity of 2 000 m3.
The works operation consists in securing the RN5 through the construction of nailed walls and the projection of concrete on cliff areas presenting risks of landslide or subsidence.