Cilj projekta je spodbujati izboljšanje energetske učinkovitosti v stavbi Univerze v Latviji, Bullu Street 5, Riga.1) načrtovani prihranek toplotne energije po izvedbi projekta ni manjši od 286,236 MWh/leto (41,04 %/leto); 2) načrtovana poraba toplote za ogrevanje po izvedbi projekta ne bo presegla 27,0 kWh/m² na leto (dejanska potreba po energiji za temperature v zaprtih prostorih vključuje tudi znaten pretok toplote iz sistema tople vode).3) Načrtovano zmanjšanje emisij CO2 za najmanj 84 806 kg/leto.Projektni skupni upravičeni stroški projekta znašajo 1 033 694,18 EUR, vključno s podporo Evropskega sklada za regionalni razvoj 85 % ali 878 640,05 EUR in financiranjem iz državnega proračuna 15 % ali 155 054,13 EUR.V skladu z energetskim pregledom in tehničnim pregledom stavbe se načrtuje izvedba naslednjih struktur za izboljšanje energetske učinkovitosti measures:1.Basic:- Izolacija fasad z uporabo pristopa hiše; —Nadomestitev vmesnih polnil z novim polnilom iz mineralne volne;- izolacija kapljic rdeče opeke;- izolacija oken od zunaj skozi obod, vključno pod obremenitvami (kadar je to fizično mogoče), s čimer se odstranijo toplotni mostovi;-oblikovanje grozdov;-Vooliranje starih celičnih oken s PVC okni s steklenim paketom s selektivnim steklom in zamenjavo starih vrat proti ognjem za izolacijo kovinskih vrat; Klub-Machate-Coaching.Klubsko-klubsko ogrevanje s steklenim paketom s selektivnim zasteklitvijo in zamenjavo starih vrat pred požarnim oknom za izolirana kovinska vrata; – ogrevalni sistem za izmenični klub s PVC okni s steklenim paketom s selektivnim zasteklitvijo in zamenjavo starih vrat pred požarnimi vrati za izolirana kovinska vrata; Foam-club insulation;-Club-club on the water-club with a glass package with selective glass and replacement of old doors for two-windows for thermal insulation;-Club-make on the water-club.Club-Plub heating with glass package with selective glazing and replacement of the old doors against the double-windows for thermal insulation;-Bludow-coat-machine heating system with PVC windows with a selective glazing and replacement of old doors against fire-windows for insulated metal doors;-Power-machine heating system with solar heating with glass windows with selective glazing and replacement of old doors against fire-windows for insulating metal doors;-Adow-clubs on the outside of the heating panel with the outdoor panel with PVC windows incl. under the loads (where it is physically possible), thus eliminating the thermal bridges of the heating system;-Changing of the heating to the water-set with the water-cluminant windows with a glass package with a selective glazing and changing the old doors against the double-windows for heating the heating with the plug-to-boat with the water-clubs.Cludating the water-club with a glass package with selective glazing and replacement of the old doors from the windows with the double-windows.Blubable for heating with the plug-boats.Blub-club-club-club on the outside of the heating system with PVC windows, incl. under the light bulbs (where it is physically possible), eliminating the thermal bridges;-Crotating the heating with the water-clubs.Alsuit with the outdoor panel with PVC windows with a selective glazing (where it is physically possible), thus eliminating the thermal bridges;-Adating the heating-foot-footlight with the old cellar with PVC windows.Alsuite to the installation with a selective glazing (where it is physically possible), eliminating the thermal bridges from the heating system;-Viking-club against the mock-boat.Changing the heating of the outdoor panel with PVC windows, incl. under the loads (where it is physically possible), eliminating the thermal bridges with the heating panels;-Admiting the windows from the outside through the PVC windows, incl. under the loads (where it is physically possible), eliminating the thermal bridges with the heating-clubs;-Viking-foot-club with the replacement of the old cellar with PVC windows with a glass package with a selective glazing and replacement of the old doors against the light-windows for the heating-foam against the heating-foam against the water-foaming.Curve the heating with PVC windows with a glass package and replacement of the old doors 14 months from the signing of the agreement on project implementation.