informacije o projektu
Datum začetka: 28 februar 2019
Datum zaključka: 27 maj 2020
financiranje
Sklad: Evropski sklad za regionalni razvoj (ERDF)
Skupen proračun: 955 704,38 €
Prispevek EU: 812 348,73 € (85%)
program
Programsko obdobje: 2014-2020
Organ upravljanja: FM
European Commission Topic

Izboljšanje energetske učinkovitosti v stavbi Mazā Lubānas iela 11, Riga

Cilj projekta je spodbujati izboljšanje energetske učinkovitosti v stavbi Univerze v Latviji, Mazā Lubānas iela 11, Riga.1), pri čemer načrtovani prihranki toplotne energije po izvedbi projekta niso manjši od 294,63 MWh/leto (40,27 %/leto); 2) načrtovana poraba toplote za ogrevanje po izvedbi projekta ne bo presegla 51,18 kWh/m² na leto;3) načrtovano zmanjšanje emisij CO2 87 024 kg/leto; Skupni upravičeni stroški projekta 955 704,38 EUR, vključno s podporo Evropskega sklada za regionalni razvoj 85 % ali 812 348,72 EUR in državnim proračunom 15 % ali 143 355,66 EUR.V skladu z energetskim pregledom in tehničnim pregledom stavbe se načrtuje izvajanje naslednjih ukrepov za izboljšanje energetske učinkovitosti v stavbah building:1.Based:-Izolacija fasade z uporabo pristopa hiše; — Zamenjava zapornih polnil;-izolacija opečnih palač; —Izolacija oken od zunaj po obodu, tudi pod okenskimi policami (kjer je to fizično mogoče); – Zamenjava kletnih oken s PVC okni s steklenim paketom s selektivnim. Replacement of old doors against fireproof insulated metal doors;-Cokola insulation;-Jump insulation;- Dismantling of balconies that will prevent their connection to thermal bridges.2.Hot water system:-Installation of solar collectors for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Installed shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water production (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Install shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Instalating shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installation of shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water preparation (with additional storage tank and connection to the existing system);-Installing shower panels with adjustable piezo buttons with maximum time for hot water (with additional storage 15 months from the signing of the agreement on project implementation.

Flag of Latvija  Riga, Latvija