project info
Start date: 1 April 2021
End date: 31 October 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 5 201 820,00 €
EU contribution: 3 795 415,08 € (72,96%)
programme
Programming period: 2014-2021
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego

Construction of GPZ Felin

The subject of the project is the construction of the station 110/15 kV Felin, in accordance with the applicable standards of PGE Dystrybucja S.A. In order to power the Felin station, the existing 110 kV lines of the Abramowice-East and Abramowice — Foundry relationship should be rebuilt. In the existing 110 kV line of the Abramowice-East link in the 28-29 span, two new strong poles will be built and two independent 110 kV line relationships will be introduced into section 1 of the designed 110/15 Felin station. AFLs type 10 300 mm² working wires will be used. In the existing 110 kV line of Abramowice — Foundry in the bay 23-24, two new strong poles will be built and two independent 110 kV line relationships will be introduced into section 2 of the designed 110/15 Felin station. AFL 8 525 mm² type working wires will be used. From the designed poles will be made references to the station 110 kV GPZ Felin. From poles 24, 28 and 29, these will be overhead outputs, in the case of the designed pole No. 23, it will be a cable line with working and return copper conductors with cross-sections of not less than 630 and 95 mm² respectively. The direct objective of the Project is to increase the possibility of connecting new generation capacities from renewable energy sources to the electricity network of the Distribution System Operator, which is PGE Dystrybucja SA. This will be achieved through the construction of 110/15 kV station.

Flag of Poland  Lubelski, Poland