Kohesio: discover EU projects in your region

project info
Start date: 8 February 2021
End date: 30 June 2023
funding
Fund: Cohesion Fund (CF)
Total budget: 6 616 854,25 €
EU contribution: 3 755 182,41 € (56,75%)
programme
Programming period: 2014-2021
Managing authority: Ministerstwo obsługujące ministra właściwego ds. rozwoju regionalnego

Construction of the 110 kV line between Annopol and Budzyń

The subject of the project is the construction of an overhead line 110 kV of the Annopol- Budzyń relationship. Total length of the line 29.6 km. The overhead line will be built in one passage as a single track and in part as a double track. The 25.6 km single-track line will be built in a triangular arrangement, using AFL 240 mm² cables. The 2.0 km long two-track line will be built in a vertical arrangement, AFL 240 mm² cables. The connection of the 110 kV overhead line at the Budzyń station (GIS switchgear — gate) will be made with a WN cable line of 0.16 km long. Due to the collision of the existing 30 kV overhead line of the Annopol — Grabówka overhead line with the 110 kV overhead line (construction of the 110 kV line along the existing 30 kV line), it will be necessary to reconstruct the SN line into a cable line of 15 kV, on the 11.7 km section.

Flag of Poland  Puławski, Poland