The direct objective of the Project is to increase the possibility of connecting new generation capacities from renewable energy sources to the electricity network of the Distribution System Operator, which is PGE Dystrybucja SA. This will be achieved through the construction of 110/15 kV station. The indirect objectives of the Project are to contribute, by increasing the possibility of admission to the network of more energy from RES, to reducing the demand for the production of energy from conventional sources, thereby reducing fuel consumption and, consequently, reducing emissions of pollutants into the atmosphere.