Expansion of the educational infrastructure for Secondary School no.194 The overall objective of the project is to reduce overcrowding at primary and secondary education level by expanding the educational infrastructure for Secondary School no.194. These measures will ensure essential conditions for ensuring a high level of participation in the educational process, thus ensuring a lower probability of school drop-out in the future, as well as the student's co-interest in education, to discourage absenteeism and reduce the phenomenon of early school drop-out, to increase the graduation rate and transition to higher levels of education.share on FacebookTwitterLinkedinEmailreport an issue