Kohesio: discover EU projects in your region

   
more info
Start date: 16 September 2014
End date: 15 December 2028
Number of projects: 25
Total budget: 281 313 837,16 €
EU contribution: 210 258 193,93 €
Website: n/a
Country: European Commission Flag
Explore more: link
funds
ERDF: 170 601 825,24 €
CF: 38 999 041,71 €
ESF: 657 326,98 €

1 - 15 of 25
PROJECTTOTAL BUDGETEU CONTRIBUTIONFUNDDeep Energy Renovation of Residential Buildings in Bucharest Sector 4 – REA3 68 300 333,42 € 49 859 243,39 € ERDF Construction of a subway station above ground level located between the Berceni Metro Station and the Belt Road 45 881 225,54 € 38 999 041,71 € CF Deep Energy Renovation of Residential Buildings in Bucharest Sector 4 – REA2 46 171 487,00 € 33 705 185,51 € ERDF Deep Energy Renovation of Residential Buildings in Bucharest Sector 4 – REA1 33 878 828,59 € 24 731 544,87 € ERDF Expansion of the educational infrastructure for the Secondary School no.190 18 819 255,64 € 15 055 404,51 € ERDF Increasing the access of pre-university students to the online learning process by equipping them with school tablets equipment 9 604 738,40 € 7 683 790,40 € ERDF Expansion of the educational infrastructure for Secondary School no.194 8 209 170,28 € 6 567 336,23 € ERDF Expanding the educational infrastructure for Avram Iancu Secondary School 6 942 040,28 € 5 553 632,23 € ERDF Supporting the capacity of state pre-university schools to manage the SARS-CoV-2 crisis 4 152 892,40 € 4 152 892,40 € ERDF Improvement of the educational infrastructure for Miron Nicolescu Technical College from Bd. Metallurgy No. 89 5 085 368,40 € 4 068 294,80 € ERDF Improvement of the educational infrastructure for Secondary School no. 190, str. Nitu Vasile no.16 3 012 466,20 € 2 409 973,00 € ERDF Increase Energy Performance for blocks of dwellings in Sector 4 of Bucharest – CPE 6 4 544 182,80 € 2 181 207,80 € ERDF Increase Energy Performance for blocks of dwellings in Sector 4 of Bucharest – CPE 5 4 259 560,00 € 2 044 588,80 € ERDF Increase Energy Performance for blocks of dwellings in Sector 4 of Bucharest – CPE 1 4 078 877,60 € 1 957 861,40 € ERDF Increase Energy Performance for blocks of dwellings in Sector 4 of Bucharest – CPE 8 3 774 730,80 € 1 811 870,80 € ERDF