The subject of the project is the reconstruction of the line 110 kV from the 110/15 kV Sieradz station to the 110/15 kV Błaszki station with a length of 38.159 km (calculated per track). The conversion of the above line is intended to enable the connection of: • 25.3 MW – Wind Farm Wójcice, • 14.7 MW – Wind Farm Wróblew – the farm is connected, but the state of the network limited its full use. The limitation is 14,7 MW. The implementation of the project will remove barriers causing limitation, • 0.7 MW – 2 pieces on the side of SB in the Błaszki station • 43.05 MW Farma Wiatrowa Warta • 2.7 MW – 4 pieces on the SN side of the station Jawor and Błaszki The project will be implemented in the Łódź Voivodeship, in the Sieradzkie District, in municipalities: Sieradz, Sparrow and Blankets. The project covers the reconstruction of: • single-track sections of line 110 kV "Sieradz – Jawor" (from station 110/15 kV "Sieradz" to pole No 103) and "Jawor – Błaszki" (from station 110/15 kV Błaszki" to pole 103) with a total length of 21.357 km and • two-track line 110 kV on the section from column no. 103 to the station "Jawor" with tracks "Sieradz – Jawor" and "Jawor – Błaszki”.