The Project concerns the construction of the section of PatraPyrgos 748km long that completes the Elefsina motorwayCorinthPatraPyrgos The new section of the motorway in the first 130km will be constructed by widening the existing National Road EO whi...
The project concerns the integrated wastewater management system in the geographical area of the Municipalities of RafinaPikermi and SpataArtemida and will provide a definitive solution to the wastewater drainage problem of the area for several decad...
The project concerns the integrated wastewater management system in the geographical area of the Municipalities of Rafina-Pikermion and Spata-Artemida and will provide a final solution to the area’s sewage treatment problem for decades.The Wastewater...
The project includes the complete construction of the section of Lamia Xynada of the Central Greece motorway (E65), with a length of 32.5 km, with a cross section of 2 lanes and an Emergency Lane (LEA) per direction. The 2 branches are separated by a...
The purpose of the proposed projects is to achieve the maximum degree of flood protection of the study areas and the settlements of permanent and holiday villages around them Parts of the streams run through inhabited areas where flooding occurs with...
The UFBB action is the main public intervention in the context of the implementation of the National Broadband Access Plan for the Next Generation 20142020 020212027 for the development of next generation broadband infrastructure with the aim of incr...
The Region of Western Macedonia together with six municipalities of the area (Argos Orestikou, Kozani, Kastoria, Florina, Eordaia, Kastoria, Grevena), ...
The UFBB action is the main public intervention in the context of the implementation of the Next Generation National Broadband Access Plan 2014-2020 for the deployment of next generation broadband infrastructure in order to increase the availability ...
The project concerns the integrated wastewater management system in the geographical area of the Municipality of Marathon and will provide a definitive solution to the area’s drainage problem for decades. The Marathon Water Treatment Center (KEL) wit...
The Project concerns the construction of approximately 3.3 km of the road section «Dimario – GR/BG Border» on the Egnatia Odos Vertical Axis 70 «Xanthi – Ehinos – GR/BG Border» from ch. 12+820 to ch. 16+147. This road section includes 6 bridges of to...
The object of the total project is the construction of the Aktion Road with the Ionian Road in the area of Lake Amvrakia, with a length of 48.5 km.The project includes the complete construction of the main artery, the construction of 7 Outland Nodes,...
The project concerns the construction of the motorway Patras Pyrgos, 74.8 km long, of which approximately 13 km are widening and improving the engraving of the existing National Road Patras – Pyrgos, while the remaining 61.8 km are shaped with a new ...
The project concerns the construction of the extension of the existing Thessaloniki Water Treatment Plant, so that the current capacity of the plant (treatment of 150.000 m² of water daily) will double. This means, in practice, an increase in the amo...
The project relates to the second phase of the segmented project to improve/upgrade the existing Western Internal Regional (desper) Thessaloniki Road to a length of about 6 km. with the construction of a six-track cross section road (3 lanes per dire...
The action aims to support/promote employment of 36,500 unemployed, with a focus mainly on vulnerable groups at high risk of exclusion (such as, but not limited to, long-term unemployed, low-skilled unemployed) and need to work first in a “protected ...