Kohesio: discover EU projects in your region



1 - 15 of 75

Highway Sibiu - Pitesti (section 2)

  • Topic image of PO03 Connected Europe
  • Flag of RO 1 465 798 000,00 € Total budget
  • Feb 2022 - Jul 2041

Highway Sibiu - Pitesti (section 3)

  • Topic image of PO03 Connected Europe
  • Flag of RO 1 406 355 657,63 € Total budget
  • Aug 2022 - Dec 2027

Construction of the bypass variant Tg. Mures - Phase 2

  • Topic image of PO03 Connected Europe
  • Flag of RO 51 479 586,96 € Total budget
  • Nov 2021 - Dec 2030

Road connection between Oradea Municipality and Sanmartin Commune - Phase II

  • Topic image of PO03 Connected Europe
  • Flag of RO 25 946 802,37 € Total budget
  • Jan 2020 - Jun 2026

MAL DEFENCES ON SULINA CANAL - FINAL STAGE

  • Topic image of PO03 Connected Europe
  • Flag of RO 45 780 827,04 € Total budget
  • Aug 2023 - Dec 2027

Route A1, Arad - Timisoara - DN69 - Phase II

  • Topic image of PO03 Connected Europe
  • Flag of RO 49 788 278,94 € Total budget
  • Jan 2024 - Dec 2030

"D.A.N.U.B.E. - Danube access network - Unlocking circulation in Europe by developing a high-quality TEN-T port infrastructure in Romania under optimal economic conditions - Port Giurgiu"- Phase II

  • Topic image of PO03 Connected Europe
  • Flag of RO 23 620 892,16 € Total budget
  • Jul 2023 - Dec 2026

Nodes (JONESTI, GRUIU, DRAGOS VODA)

  • Topic image of PO03 Connected Europe
  • Flag of RO 38 483 752,19 € Total budget
  • Jan 2025 - Dec 2027

Expanding CSCT's operating capacity through the acquisition of new equipment, contributing to the reduction of the blockade in the area of Romanian ports, as a result of the blockade of the naval routes in Ukraine

  • Topic image of PO03 Connected Europe
  • Flag of RO 7 954 760,01 € Total budget
  • Apr 2024 - Dec 2026
1 - 15 of 75